WMRS packs in repair team to fix snow cat. On June 14, 2005 the WMRS snowcat suffered a broken steering linkage about 1.5 miles south of Barcroft Station, north of the gate. Repairs required hauling in a welding torch, chain hoist, and other heavy tools. WMRS' Ryan Kitts rounded up a mule and three horses to pack in make the repairs. This was possible because most of the snow has melted out except for in a few deep drifts which can be circumvented. The repair team consisted of Ryan, Gary, and Denise. Matt came down from Barcroft to assist. |
|
![]() |
![]() |
Gary (L) and Ryan pack in, starting near Patriarch
Grove. It was a very windy day. |
Swivelling the suspension around using a come-along
attached to a rock. 6-21-05 |
![]() |
![]() |
It took 5 hours with the cutting torch to install the replacement linkage. 6-21-05 |
Heading home in the evening, snowcat in front. |